MM&A EXPERT LTDHOTEL & LIVING-SECTOR FIT-OUT · UK-WIDE
MM&A ExpertDrylining. Plastering.
Tape & jointing.

PROJECTS / DELIVERY RECORD

Hotel and living-sector
project record.

Filter by sector and MM&A package status. Figures below are the supplied package quantities, not whole-building measurements.

Unless marked otherwise, the supplied project scope is a full drylining package: metal, boarding, insulation, ceilings and tape & jointing. Current schemes are identified separately. Status refers to the MM&A package, not hotel opening or whole-development completion.

15 projects

Aloft Manchester tower on Deansgate within the city skyline
Property exterior · Official gallery ↗
Hotels / 2024Complete

Aloft by Marriott

Manchester

358 rooms

Walls / linings
46,000 m²
Ceilings
10,000 m²
Tape & joint
62,000 m²

22 floors

Full drylining package

Red-brick exterior of Four Points Flex by Sheraton London Euston
Property exterior · Official gallery ↗
Hotels / 2023Complete

Four Points Flex by Sheraton

London Euston

201 rooms

Walls / linings
14,000 m²
Ceilings
7,800 m²
Tape & joint
11,000 m²

Full drylining package

Spark by Hilton Romford exterior beside Romford station
Property exterior · Official gallery ↗
Hotels / 2022Complete

Spark by Hilton

Romford

125 rooms

Tape & joint
17,000 m²

TAPE & JOINTING ONLY

Architectural visualisation of Hilton Fletton Quays beside the river in Peterborough
Architectural visualisation
Hotels / 2022Complete

Hilton Fletton Quays

Peterborough

120 rooms

Walls / linings
21,000 m²
Ceilings
7,600 m²

Full drylining package

Hotels / 2021Complete

Blakes

Corsham Street, London

85 rooms

Walls / linings
13,000 m²
Ceilings
4,200 m²
Tape & joint
6,700 m²

Full drylining package

Existing Hilton London Bankside hotel exterior
Existing hotel exterior
Hotels / 2024Complete

Hilton Bankside extension

London

78 rooms

Walls / linings
14,000 m²
Ceilings
2,700 m²
Tape & joint
17,000 m²

Full drylining package

Hotels / 2026Current

FPX Hotel

King’s Cross, London

92 rooms

Hotels / 2026Current

City Continental Hotel

Earl’s Court, London

90 rooms

Living / 2023Complete

Portland Square

Bristol

259 rooms

Walls / linings
17,000 m²
Ceilings
12,000 m²
Tape & joint
19,000 m²

Full drylining package

Living / 2026Current

Laystall Street

Ancoats, Manchester

154 rooms

Living / 2022Complete

Fletton Quays residential

Peterborough

100 apartments

Education / 2022Complete

Jesus College and Emmanuel College

Cambridge

Education / 2025Complete

Harris Academy Battersea extension

London

Walls / linings
1,300 m²
Ceilings
740 m²
Tape & joint
2,500 m²

Full drylining package

Commercial / 2022Complete

Office fit-out

St Albans

Commercial / 2022Complete

Flight Club

Cardiff

Images show the identified properties; architectural visualisations are labelled. These reference images do not document the installed drylining. Official gallery sources are linked where available.